INSTALLATION
PROCEDURE
1. INSTALL TRANSMISSION REVOLUTION SENSOR (NT)
(a) Apply Toyota Genuine CVT fluid FE to a new O-ring.
(b) Install the O-ring to the transmission revolution sensor (NT).
(c) Install the transmission revolution sensor (NT) to the continuously variable transaxle assembly with the bolt.
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
(d) Connect the connector.
2. INSTALL TRANSMISSION REVOLUTION SENSOR (NOUT)
(a) Apply Toyota Genuine CVT fluid FE to a new O-ring.
(b) Install the O-ring to the transmission revolution sensor (NOUT).
(c) Install the transmission revolution sensor (NOUT) to the continuously variable transaxle assembly with the bolt.
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
(d) Connect the connector.
3. INSTALL TRANSMISSION REVOLUTION SENSOR (NIN)
(a) Apply Toyota Genuine CVT fluid FE to a new O-ring.
(b) Install the O-ring to the transmission revolution sensor (NIN).
(c) Install the transmission revolution sensor (NIN) to the continuously variable transaxle assembly with the bolt.
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
(d) Connect the connector.
4. INSTALL BATTERY CLAMP SUB-ASSEMBLY
Click here
5. INSTALL ECM
Click here
6. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Click here
7. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
Click here
8. INSTALL NO. 1 AIR CLEANER INLET
Click here
9. INSTALL RADIATOR COVER
Click here
10. INSTALL BATTERY
Click here
11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here
12. INSTALL NO. 2 CYLINDER HEAD COVER
Click here
13. CHECK DATA LIST
Click here
Toyota CH-R Service Manual > Can Communication System: Check Bus 2 Lines for Short Circuit
DESCRIPTION
There may be a short circuit between the CAN main bus lines and/or CAN branch
lines when the resistance between terminals 18 (CA4H) and 17 (CA4L) of the central
gateway ECU (network gateway ECU) is below 54 Ω.
Symptom
Trouble Area
Resistance ...
Toyota CH-R Service Manual > Park / Neutral Position Switch: Inspection
INSPECTION
PROCEDURE
1. INSPECT PARK/NEUTRAL POSITION SWITCH
*a
Component without harness connected
(Park/Neutral Position Switch)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
...