INSTALLATION
PROCEDURE
1. INSTALL BLOWER ASSEMBLY
(a) Engage the guides to install the air conditioning radiator assembly. |
|
(b) Install the 2 screws.
(c) Engage the guide. |
|
(d) Connect the connector.
2. INSTALL NO. 3 INSTRUMENT PANEL WIRE (w/ PTC Heater)
Click here
3. INSTALL NO. 2 AIR DUCT
Click here
4. INSTALL AIR CONDITIONER UNIT ASSEMBLY
Click here
Toyota CH-R Service Manual > Brake Master Cylinder: Removal
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration)
that must be performed after parts are removed, installed, or replaced during the
brake master cylinder sub-assembly removal/installation are shown below.
Necessary Procedure Af ...
Toyota CH-R Service Manual > Steering Pad Switch: Inspection
INSPECTION
PROCEDURE
1. INSPECT STEERING PAD SWITCH ASSEMBLY
(a) Measure the resistance according to the value(s) in the table below.
*A
w/ Lane Departure Alert System
*B
w/ Voice Switch
*C
w/ Microphone
-
...